    A brief analysis of the transformation process of coating production line
    Time:2012-10-22 11:51:38

           The painting production line of the complete machine is designed by the former First Design and Research Institute of machinery Industry, which adopts the advanced and mature industrial art in China at that time, and improves the mechanization and automation level of the painting production line, so as to improve the working environment and reduce the labor intensity of workers. At the same time, it has earnestly implemented the relevant state laws and regulations, norms and standards, and worked hard to do a good job in environmental protection and occupational safety and health.


           The whole production line by line, drying, screening, drying, paint on the surface and, offline 7 station such as composition, except on and off the five stations by an organic water drying room, shielding room, water spray paint room, flow flat room and dry room of a closed production line, and workshop is separated, ensures the whole paint areas relatively clean. In addition, a complete machine cleaning section is built at one end of the workshop for secondary cleaning of the complete machine. The whole machine adopts double board ground chain transportation to improve the mechanization level.


           Process flow: water gun oil removal cleaning -- on line -- hot air drying -- shielding -- surface paint spraying -- leveling -- drying -- removing shielding -- off line.


           The operation time of each station is 45min, and the cycle time of the pipeline can be adjusted appropriately according to the actual use.


           The paint varieties are komatsu yellow acrylic polyurethane enamel and the spray gun is electrostatic mixed air spray gun.


           The coating production line can produce 2000 loaders per year when only units are arranged for production. The total number of designers in the coating workshop is 24, including 16 production workers. The average annual output of each production worker is 142 loaders.


    Second, the question raises

           After 2003, due to the country to increase the investment in infrastructure, the loader industry into the good situation of flourishing production and marketing, several major loader production enterprises have reached their maximum output record. At the same time, each manufacturer has improved the appearance quality. The paint is mainly used to color the loader. The loader's appearance color is divided into two parts, which changes the loader's single color for a long time.


           With the increase of loader output and the extensive use of exterior paint color registration, several problems occurred in the application process of complete machine coating line:

           (1) the surface spray paint tinted homework makes loader shorter time () down on a painting area, and screen instead of to shorten the time, and extension of trend, make the whole assembly line beat changed, when in low yield, but increased the waiting time for some station, yield increase and then need to be partially blocked work offline.

           (2) Due to the shortened beat of the entire production line, there is a heating process in the water mark drying room, so that the temperature just rises to the specified temperature and sometimes even does not rise to the specified temperature, it needs to be transferred to the next station, which cannot play a role at all. However, the water mark drying room is a pass-through type, and the temperature immediately drops to the ambient temperature after the door is opened.

           (3) The drying room also has the same problem as the water mark drying room, which cannot give full play to the drying role.

           (4) The door of each chamber adopts pneumatic door, the time of switch is long, fully open or completely close is about 3-5min, in the whole beat is long (45min), do not feel, after the beat is shortened it seems a little too long.

           (5) the utilization rate of the waste gas treatment device is too low, because the exhaust gas in the paint room is fully mixed with water, and the air volume is large, so the organic solvent content discharged into the atmosphere can meet the emission standards. The drying chamber USES the hot air circulation, a small part of the exhaust gas emissions, this small part of the exhaust gas may exceed the standard, so most of the production lines have added activated carbon adsorption device.


    3. Suggestions for improvement

           It is impossible to solve the above problems by using the current intermittent pass-through production line. To completely solve the above problem, only fundamentally change the production line type, or like a car factory adopted by type production line, continuous operation, every room body is longer, the whole production line without door, drying room a preliminary drying and strong cold area, and use the wind curtain interception heat, or use the Chambers and decorate, a spray room with 2-3 drying room, loader into the drying chamber immediately after spray paint, flat, drying in the process of heating up, some large-scale passenger car manufacturer both in this way.


    Iv. Practical operation

    With the increasing production of loaders, the measures taken by our company are as follows:

           1) After cleaning and removing oil, the loader should take the way of natural cooling and drying, pay attention to maintain balanced production, if the weather is bad, use the night time to dry.

           (2) When the production line is in operation, the water-mark drying room does not work, and most of the shielding work is carried out offline.

           (3) All the doors of the room are closed when painting, in order to save time. In this way, it is easy to cause the paint mist to fly to the shielding room and leveling room next to the paint room.

           (4) A new 720m2 hangar will be built for parking the loader sprayed with paint, and the painting and decoration work will be carried out here; When the temperature is low, use the evening time to dry.

           (5) Make some baffles of shield glass with tin sheet to save the time of shield glass.

        

           Through the above measures, the company has ensured the painting workshop in the case of no night shift, Nissan 15-20 loaders. Of course, the above measures are a little harmful to the production line. In order to improve the problem of drying in winter, the company plans to build a new drying room for drying the paint of the whole machine, and prepare to move the water-mark drying room below the line to play its role.

    Service hotline

    020-36860788

    WeChat

    Feedback

    Feedback

    主站蜘蛛池模板: 国产一在线观看| 亚洲a级毛片| 日本高清视频网站www| 精品国产福利久久久| 久久性视频| 116美女极品a级毛片| 日本熟妇色熟妇在线视频播放| 美女高潮黄又色高清视频免费 | 日本阿v片在线播放免费| 亚洲午夜无码AV不卡| 国产成人无码一区二区在线播放| 亚洲三区在线观看无套内射| 国产高欧美性情一线在线| 免费一级毛片| 免费无码精品黄av电影| 人妻 校园 激情 另类| 欧美精品三级在线| 日韩人妻无码精品—专区| 最新亚洲av日韩av二区| 亚洲熟妇精品一区二区| 强奷乱码中文字幕乱老妇| 亚洲亚洲人成综合网络| 国产亚洲美女精品久久| 亚洲欧美日韩中文字幕网址 | 欧美三级超在线视频| 男人的天堂2018无码| 激情综合丁香五月| 99久久久无码国产精品古装| 一区二区三区精品视频免费播放| avの在线观看不卡| 亚洲第一区欧美国产综合| 99久久无码国产精品性出奶水| 欧洲成人在线观看| 97成人碰碰久久人人超级碰oo| 日日天日日夜日日摸| 粗大的内捧猛烈进出视频| 狠狠干视频网站| 国产尤物精品自在拍视频首页| 日韩av日韩av在线| 久久se精品一区二区| 国产精品页|